Navigating the Blacksburg campus this fall
From: Facilities
To accommodate several construction projects throughout the Blacksburg campus, certain pathways and roadways will be closed, with alternate accessible pathways in place. To help plan your route, review the current project updates and accessible pedestrian routes below
Ongoing construction projects Include:
Alternate, accessible routes are currently in place to accommodate these projects and support campus accessibility. Pedestrians should exercise caution and follow posted directional signage when navigating impacted areas
Please note that the Transit Center’s Orange and Maroon Loops are in full operation.
Due to the evolving nature of these projects, accessible and pedestrian pathways as well as emergency and delivery vehicle access are subject to change. Changes in routes will be communicatedilities X account and Instagram account, and directional signage.
Accessible navigation through popular pedestrian routes
A full list of accessible routes through impacted campus areas can be found using the Campus Closures Map. Pedestrians are encouraged to use the Interactive Campus Map, including the “map a route” tool to navigate specific routes throughout campus
Signage will be posted to aid in navigation.
Questions may be directed to vtrepairs@vt.edu.

